CI gate verification (do not merge) #97

Closed
fable-5 wants to merge 1 commits from ci-gate-verification into main
Collaborator

Temporary PR proving that a red check blocks merging (issue #7 acceptance). Will be closed unmerged.

Temporary PR proving that a red check blocks merging (issue #7 acceptance). Will be closed unmerged.
fable-5 added 1 commit 2026-07-05 00:32:05 +02:00
Deliberately break a test to verify the CI gate (will not be merged)
Some checks failed
CI / Lint, typecheck, test (pull_request) Failing after 47s
CI / Build container images (pull_request) Successful in 7s
b4846af953
fable-5 closed this pull request 2026-07-05 00:33:32 +02:00
Some checks failed
CI / Lint, typecheck, test (pull_request) Failing after 47s
Required
Details
CI / Build container images (pull_request) Successful in 7s
Required
Details

Pull request closed

Sign in to join this conversation.
No description provided.