|
All checks were successful
Release / Build release images and notes (push) Successful in 1m8s
CD / Build and push images (push) Successful in 1m9s
CD / Deploy to Test (push) Successful in 9s
Release / Release-candidate operations QA (push) Successful in 41s
CD / Smoke tests against Test (push) Successful in 1m10s
CD / Promote to Int (push) Successful in 10s
Prod deploy / Deploy the released images to Prod (push) Successful in 15s
CI / Lint, typecheck, test (push) Successful in 3m35s
CI / Build container images (push) Has been skipped
CI / Auth e2e pack (push) Successful in 5m32s
CI / Import/export fidelity gate (push) Successful in 48s
New deploy/release-qa.sh, wired as the release workflow's second job: it boots the PREVIOUS release with pre-seeded fixture content in a scratch environment, swaps the api to the candidate against the same database (migrations auto-apply, readiness green, content intact — the seed_fixture/assert_fixture pair is the update-fixture contract future migrations extend), asserts the degraded-readyz semantics on the candidate (200 + warn-level checks without sidecars), and runs a full backup/restore roundtrip with the candidate's sidecar into a second, empty database. The wizard e2e already guards fresh installs in CI (issue #81). Verified green on the host for v0.1.0→v0.1.1; a simulated destructive migration made the suite fail loudly (negative test, not committed). A human pushes the prod tag only when both release jobs are green — the documented pre-approval gate. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01EwZ4jR4KFAPvpjWevfUGX1 |
||
|---|---|---|
| .. | ||
| backup | ||
| compose | ||
| fonts | ||
| go-live.md | ||
| monitoring.md | ||
| release-qa.sh | ||
| self-hosting-verify.sh | ||
| stages.md | ||