dorfteich/apps
Claude Fable 5 269b36c761
Some checks failed
CD / Build and push images (push) Successful in 2m53s
CD / Deploy to Test (push) Successful in 9s
CD / Smoke tests against Test (push) Successful in 1m11s
CI / Lint, typecheck, test (push) Failing after 4m22s
CI / Auth e2e pack (push) Has been skipped
CI / Import/export fidelity gate (push) Has been skipped
CI / Build container images (push) Has been skipped
CD / Promote to Int (push) Successful in 11s
Fix the gates the #116 commit skipped past
The asset type lost its name field during the split into path+extension
(tsc error), and the fixture's .obsidian/app.json needed Prettier's
formatting. Lesson from the /srv move repeated within one day: the gate
chain must gate — never '; echo' past a failing typecheck.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-14 16:53:11 +02:00
..
api Fix the gates the #116 commit skipped past 2026-07-14 16:53:11 +02:00
backup Backup mirror to BASEL: rsync of the sets after every successful run (#84) 2026-07-12 12:20:32 +02:00
collab Deflake the collab restore-listener DB test (poll for the PRE_RESTORE row) 2026-07-12 11:23:18 +02:00
web Offer creating the page on the not-found screen (#115) 2026-07-14 16:45:27 +02:00