dorfteich/.gitea/workflows
Claude Fable 5 14711a18c2
All checks were successful
CD / Build and push images (push) Successful in 1m9s
CD / Deploy to Test (push) Successful in 10s
CD / Smoke tests against Test (push) Successful in 1m12s
CD / Promote to Int (push) Successful in 10s
CI / Lint, typecheck, test (push) Successful in 4m18s
CI / Build container images (push) Has been skipped
CI / Auth e2e pack (push) Successful in 5m59s
CI / Import/export fidelity gate (push) Successful in 47s
QA: page-tree and graph e2e packs in CI, manuals updated (#114)
Two new CI-wired Playwright packs, each in its own shared pond so the
fixture ponds stay untouched:

- page-tree.spec.ts — create-as-child with the form hint, collapsible
  folder view (collapse state survives reload), label view grouping,
  the local view override vs the owner-set pond default (fresh context
  without localStorage sees the new default), the Move-to dialog with
  the own subtree disabled, promote vs subtree delete, and a restored
  orphan re-attaching at the root.
- graph.spec.ts — pond graph nodes/edges/legend, node click-through,
  the phantom-create flow (dashed node turns solid), the local panel
  with hop toggle and highlight ring, and the permission slice: a
  label-denied reader sees neither the hidden node nor its edge.

Both packs 3× flake-free locally. Manuals: user guide (page tree,
moving/deleting with subpages, knowledge graph + local graph), pond
admin guide (sidebar view default), features.md (knowledge graph
bullet) — with the docs/de mirrors updated (English authoritative).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-14 11:10:14 +02:00
..
cd.yml Add backup sidecar: nightly dump, volume archive, prune, status, restore (#83) 2026-07-11 17:29:15 +02:00
ci.yml QA: page-tree and graph e2e packs in CI, manuals updated (#114) 2026-07-14 11:10:14 +02:00
drill.yml Point the monthly restore drill at Prod (go-live #87) 2026-07-12 19:58:19 +02:00
prod-deploy.yml Add the release pipeline with a tag-based manual gate and Prod stack (#89) 2026-07-12 00:17:13 +02:00
release.yml Run operations QA on every release candidate before the prod gate (#90) 2026-07-12 00:29:53 +02:00