Commit Graph

3 Commits

Author SHA1 Message Date
514cdf5ead Move stages, runner and deploy target to dedicated host ONE
All checks were successful
CD / Build and push images (push) Successful in 3m45s
CI / Lint, typecheck, test (push) Successful in 3m39s
CI / Auth e2e pack (push) Successful in 3m43s
CI / Import/export fidelity gate (push) Successful in 43s
CI / Build container images (push) Has been skipped
CD / Deploy to Test (push) Successful in 9s
CD / Smoke tests against Test (push) Successful in 1m12s
CD / Promote to Int (push) Successful in 10s
Gitea itself relocated to the dedicated Hetzner server ONE
(one.101010.cloud); this commit moves the rest of the delivery chain
along: cd.yml now deploys to one.101010.cloud (DEPLOY_HOST_KEY secret
rotated to ONE's host key), the act_runner one-dorfteich replaces
vps-dorfteich, and the stage/deployment docs describe the new topology
(Test/Int migrated with volumes; Prod joins on the same host at M8).
The Int promotion gate variable RUN_INT_DEPLOY was removed — the new
host has the capacity, so promote-int deploys again by default.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01EwZ4jR4KFAPvpjWevfUGX1
2026-07-11 08:05:36 +02:00
6517c8fb71 Update topology: non-prod stages on the VPS, Prod host decided at go-live
Kickoff update by the project owner: test.dorfteich.cloud and
int.dorfteich.cloud run on the VPS 188.245.116.44 (DNS for
*.dorfteich.cloud and *.dorfteich.online already points there); the
Prod host for dorfteich.online is chosen at go-live. Dev runs locally
via Docker. Affects deployment.md, roadmap.md, and ADR 0014; the
matching Gitea issues (#8, #9, #87, #89) were updated in place.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-04 15:20:58 +02:00
0629411966 Add architecture documentation, ADRs, and operations concept
Initial deliverable of the architecture phase: 16 ADRs (stack, CRDT
collaboration, plugin sandbox, import/export, backups, CI/CD), data
model, permission model, real-time collaboration and plugin concepts,
deployment/operations/security documentation, and the milestone roadmap
that the implementation issues are derived from.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-04 14:36:16 +02:00